Replies: 4 comments 6 replies
-
Can you check again? Those you're mentioned related to power grid strategy
|
Beta Was this translation helpful? Give feedback.
-
I believe the report is for all nets including the power grid. Do you actually observe signal nets on those layers? |
Beta Was this translation helpful? Give feedback.
-
What design are you running? |
Beta Was this translation helpful? Give feedback.
-
The pins on M5 will be unreachable:
I changed M5 to M3 and it routes fine. @eder-matheus we should have a check for pins above the max routing layer (or connect from below with your new drt work) |
Beta Was this translation helpful? Give feedback.
-
For routing I am setting "MIN_ROUTING_LAYER = M2" "MAX_ROUTING_LAYER = M4" in the /OpenROAD-flow-scripts/flow/platforms/asap7/config.mk file.
But, In routing stage tool is using M5 and M6 while routing I also tried with "MIN_ROUTING_LAYER = M2" "MAX_ROUTING_LAYER = M8" but there is no change in routing, tool is using upto M6.
Is it a tool issue or I am doing something wrong. It would be great if you help me with the issue.
Thank you for your time.
Beta Was this translation helpful? Give feedback.
All reactions