Skip to content

Nightly Flink Connector Pulsar #246

Nightly Flink Connector Pulsar

Nightly Flink Connector Pulsar #246

Triggered via schedule October 15, 2023 00:20
Status Failure
Total duration 40m 26s
Artifacts

daily.yml

on: schedule
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 5 warnings
compile_and_test (1.18-SNAPSHOT, main) / compile_and_test (8)
Process completed with exit code 1.
compile_and_test (1.18-SNAPSHOT, main) / compile_and_test (11)
The job was canceled because "_8" failed.
compile_and_test (1.18-SNAPSHOT, main) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.17-SNAPSHOT, main) / compile_and_test (11)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
compile_and_test (1.17-SNAPSHOT, main) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.17-SNAPSHOT, main) / compile_and_test (8)
The job was canceled because "_11" failed.
compile_and_test (1.17-SNAPSHOT, main) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.16.2, v3.0) / compile_and_test (11)
Cache save failed.
compile_and_test (1.18-SNAPSHOT, main) / compile_and_test (11)
Runner GitHub Actions 141 did not respond to a cancelation request with 00:05:00.
compile_and_test (1.17.1, v4.0) / compile_and_test (11)
Cache save failed.
compile_and_test (1.16.2, v3.0) / compile_and_test (8)
Cache save failed.
compile_and_test (1.17.1, v4.0) / compile_and_test (8)
Cache save failed.