Skip to content

chore(deps): bump github.com/onsi/gomega from 1.36.1 to 1.36.2 (#3740) #1663

chore(deps): bump github.com/onsi/gomega from 1.36.1 to 1.36.2 (#3740)

chore(deps): bump github.com/onsi/gomega from 1.36.1 to 1.36.2 (#3740) #1663

Triggered via push December 31, 2024 02:34
Status Failure
Total duration 35m 45s
Artifacts 9
Matrix: compatibility_e2e_tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 4 warnings
compatibility_e2e_tests (scheduler)
Process completed with exit code 1.
compatibility_e2e_tests (seed-client)
The job was canceled because "scheduler" failed.
compatibility_e2e_tests (seed-client)
The operation was canceled.
compatibility_e2e_tests (client)
The job was canceled because "scheduler" failed.
compatibility_e2e_tests (client)
The operation was canceled.
compatibility_e2e_tests (manager)
The job was canceled because "scheduler" failed.
compatibility_e2e_tests (manager)
The operation was canceled.
compatibility_e2e_tests (scheduler)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
compatibility_e2e_tests (seed-client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
compatibility_e2e_tests (client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
compatibility_e2e_tests (manager)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
dragonflyoss~dragonfly~B7PP2A.dockerbuild
42.9 KB
dragonflyoss~dragonfly~E73D0C.dockerbuild
42.9 KB
dragonflyoss~dragonfly~IKAADI.dockerbuild
43.5 KB
dragonflyoss~dragonfly~LSZS01.dockerbuild
49.8 KB
dragonflyoss~dragonfly~MYE2F1.dockerbuild
50.6 KB
dragonflyoss~dragonfly~MYI6RP.dockerbuild
50.2 KB
dragonflyoss~dragonfly~N7G7VL.dockerbuild
50.7 KB
dragonflyoss~dragonfly~UDST6I.dockerbuild
43.1 KB
scheduler-e2e-tests-logs
3.75 MB