Add support for fullstory relay options #802
Open
Mergeable / Mergeable: Change Control Pre-Merge-Check
failed
Sep 9, 2024 in 0s
Mergeable Run has been Completed!
Status: FAIL
Here are some stats of the run:
3 validations were ran.
Details
❌ Change-Control Pre-Merge Check
All PRs must follow bellow Change-Control rules:
-
❌ Must have at least one approval.
-
❌ Description includes a testing plan:
"Testing not required" OR "Testing completed successfully" but NOT BOTH.
OR
Jira Change-Control ticket is included.
PRs that are exempt from Change-Control:
-
❌ Title includes stage, staging, README, non-prod, docs.
Loading